Procurement

The first implementation phase of the project will take place in February 2007. During this phase, the backbone links will be established and the equipment in the tower will be mounted.
For this purpose, the following equipment will be procured:

Local procurement in Nigeria

3 x AirClient NEXUS PRO TOTAL
1 x AirPoint NEXIS PROP TOTAL
4 x UPS 300 kVA
4 x poles and brackets
1 x Ethernet Cat 5e (100m)
1 x Ethernet kit (crimper, RJ45 connectors, RJ45 covers, cable tester)
1 x driller (concrete), screws, plugs, electrical screwdriver
2 x Power cable outdoor
4 x Surge protection (roof mounted)
1 x Aluminium ladder
5 x Power extenders
5 x power bars

Other

* Quote from local supplier in Nigeria: Quote

* Choice of equipment and interoperability: Questions and Answers

Oversees procurement in Sweden

1 x Walkie Talkie (1 set= 2 units)
1 x GPS
2 x Binoculars
2 x PCMCIA
2 x Testing kit (PCMCIA, pigtail, RF-cable, panel antenna 9dBi)
3 x RF cables (to external antennas on base station)
3 x Antenna (external antennas to base station)
1 x Climbing Harness
1 x AirClient NEXUS PRO TOTAL
1 x AirPoint NEXUS PRO TOTAL
10 x Chassis Mount N-connectors, bolts and nuts